95% of our timber frame houses are in need to steel or laminated beams, columns or more complex structures. Over period of 20 years we have mastered construction of these structures, so we can proudly announce ourselves as professionals of engineering and assembly of Glue-Laminated and CLT structures. We outsource the CLT elements from the factories all over the Baltics, as we have known them from the roots of our company, when we were operating as a sawmill. The biggest CLT structure where we have worked as a general contractor in a design to build process is located in Linkoping, Sweden. Where we produced 112 apartment, 7 floor passive technology house all made out of wood – main structure – CLT + Glue-Laminated bams, external façade – timber frame. Please check out more in section – Award Winning projects